We now have a second storey! And so far things look to be in the right places. Luckily it was much less muddy this time we visited, so we didn't end up with huge, heavy mud-boots like last time.
Front left - garage will be between the camera and the house.
Front, slightly to the left.
Front right.
Second floor, looking towards the back. That mess of wood will turn into bedrooms later.
We visited the site the other day and found the beginnings of a frame. We've since been told the entire first floor frame is done, and that the second floor will be started today, weather permitting.
Some frame building materials.
Our independent inspector surveys the work done so far.
The wall frames were lying on their side on the slab when we visited (Saturday 17th April)