Site start to handover in 9 months and 8 days (284 calendar days)
Sunday, April 25, 2010
More frame!
We now have a second storey! And so far things look to be in the right places. Luckily it was much less muddy this time we visited, so we didn't end up with huge, heavy mud-boots like last time.
Front left - garage will be between the camera and the house.
Front, slightly to the left.
Front right.
Second floor, looking towards the back. That mess of wood will turn into bedrooms later.
No comments:
Post a Comment