We visited the site the other day and found the beginnings of a frame. We've since been told the entire first floor frame is done, and that the second floor will be started today, weather permitting.
Some frame building materials.
Our independent inspector surveys the work done so far.
The wall frames were lying on their side on the slab when we visited (Saturday 17th April)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment