The garage roof is also nearly complete! SS says he expects completion in early December, but I will believe it when I see it :)
He also mentioned the bricks at the front again - apparently the construction manager is still thinking about it, so he can't tell me what their plans are yet. So all we can do there is wait..
Leftover tiles |
This is how they block the front door |
Laundry |
Powder room. The tiles around the mirror are the wrong type, they should be the "pepper" tiles seen in the bathroom and ensuite. |
Bathroom |
Ensuite. This feature strip is also 3 times the right width. Also the wall on the right of this picture is supposed to be tiled but wasn't. |
Overwide strip, again in the ensuite. This is the ensuite shower. |
Garage roof under construction |
Garage roof nearly complete. The ladder is for plumbers to do guttering up behind the garage. |