The ensuite shower, now with feature strip. |
Ensuite tiling is complete all way around now. |
Part of the bath hob tap is installed. |
Tiling around the mirror is complete |
Tiling here is complete too. |
And here's the other wall of the bathroom shower |
Toilets have been installed too, and all the other plumbing. |
Carpets were being laid when I took the pictures. The carpets are complete now. |
This stuff is under the carpets. |
We are proud half owners of the rightmost 2 metres of the lighter coloured fence. We owe someone $55 for it. Actually we haven't paid for the darker coloured part yet either, but they haven't asked. |
A few overall pictures of the house. They were cleaning inside today. |
Taken from next door, where the build seems to have stalled. |
From the front. |
The nawkawed bricks |
Nawkawed bricks at the side. |